A sign with the logo of Leeds Building Society on it

Case Study

Leeds Building Society

Fire Stopping Services

Background

In July 2024, Leeds Building Society needed support, installing passive fire protection as they refurbished their North Shields’ branch.

Installation around services and between floors was required to prevent the spread of fire within the building.

And professional expertise was needed to implement the right fire controls. Effective fire-resisting compartmentation, enabling safe evacuation and a safer working environment for everyone on site.

Challenges

Solution

As a FIRAS accredited installer of firestopping services, Squared Circle was appointed by the main building contractor in charge of the branch refurbishment.


We were able to provide a working solution and full installation, with the highest standards of workmanship.


Removing the existing boiler room ceiling on the 1st Floor and installing Fireline board. Providing 60-minute fire protection between floors, as well as firestopping sections of ceilings that had been removed during the roof works.

Results